ECO ANCHORS MAINTAINED BY THE CSCC

All anchors should be checked before use. Checks To Do

Anchors that do not meet the tests should be reported to the bolting co-ordinator via email

Anchors in the CSCC region that are not listed below have not been placed by the CSCC and are therefore not covered by the anchor insurance scheme.

The BCA Anchor Placement Scheme was developed by the CNCC.  Information about the Scheme.


List of placement by cave:

Blacknor Hole
Anchor Number Next Test Due  
BH-EP-01 N/A Cut Off
BH-EP-02 N/A Cut Off
BH-EP-03 23-Jun-06  
BH-EP-04 23-Jun-06  
BH-EP-05 23-Jun-06  
BH-EP-06 23-Jun-06  

NB First 2 bolts have been cut off therefore making it unsafe to test the rest of the bolts, therefore the CSCC has agreed to let the remaining bolts lapse


GB Cave
Anchor Number Next Test Due
GB-LD-01 12-Nov-09
GB-LD-02 12-Nov-09
GB-LD-03 12-Nov-09
GB-LD-04 12-Nov-09

Gough's Cave
Anchor Number Next Test Due
GC-LH-01 17-Nov-10
GC-LH-02 17-Nov-10
GC-LH-03 17-Nov-10
GC-LH-04 17-Nov-10
GC-LH-05 17-Nov-10
GC-LH-06 17-Nov-10
GC-LH-07 17-Nov-10
GC-OX-01 12-Jul-07
GC-OX-02 12-Jul-07
GC-OX-03 12-Jul-07

Hunter's Hole
Anchor Number Next Test Due
HH-EP-01 07-Apr-12
HH-EP-02 07-Apr-12
HH-MH-01 07-Apr-12
HH-MH-02 07-Apr-12
HH-MH-03 07-Apr-12
HH-MH-04 07-Apr-12
HH-MH-05 07-Apr-12
HH-MH-06 07-Apr-12
HH-MH-07 07-Apr-12
HH-FR-01 07-Apr-12
HH-FR-02 07-Apr-12
HH-FR-03 07-Apr-12
HH-FR-04 07-Apr-12
HH-FR-05 07-Apr-12
HH-FR-06 07-Apr-12
HH-FR-07 07-Apr-12
HH-FR-08 07-Apr-12
HH-FR-09 07-Apr-12
HH-SP-01 07-Apr-12
HH-SP-02 07-Apr-12
HH-SP-03 07-Apr-12

ENTRANCE PITCH, DIRECT, TRAVERSE (RIGHT-HAND ROUTE), SAGO POT
Topo courteousy of Chris Binding

Hunter's Hole Rigging Topo

Longwood Swallet
Anchor Number Next Test Due
LO-SP-01 20-Dec-08


Manor Farm Swallet
Anchor Number Next Test Due
MF-SR-01 11-Jan-09
MF-SR-02 11-Jan-09
MF-SR-03 11-Jan-09
MF-SR-04 11-Jan-09

Rhino Rift
Anchor Number Next Test Due  
RR-FP-01 06-Jun-08  
RR-FP-02 16-Nov-10  
RR-FP-03 16-Nov-10  
RR-FP-04 06-Jun-08  
RR-FP-05 N/A Removed
RR-FP-06 N/A Removed
RR-FP-07 16-Nov-10  
RR-FP-08 06-Jun-08  
RR-SP-01 16-Nov-10  
RR-SP-02 16-Nov-10  
RR-SP-03 16-Nov-10  
RR-SP-04 16-Nov-10  
RR-SP-05 16-Nov-10  
RR-SP-06 16-Nov-10  
RR-TP-01 16-Nov-10  
RR-TP-02 16-Nov-10  
RR-TP-03 16-Nov-10  

The rigging below is now not correct for the first pitch: The Y-hang is made of tape (to be replaced with chain) to pass below the buldge of rock below that is not stable. The remaining cave rigging is the same.

Rhino Rift Topo


Rod's Pot
Anchor Number Next Test Due
RP-PP-01 11-Jan-09
RP-PP-02 11-Jan-09

Star Shaft
Anchor Number Next Test Due
SS-EP-01 5-Mar-08
SS-EP-02 5-Mar-08
SS-EP-03 14-Oct-07
SS-SP-01 4-Oct-07
SS-SP-02 4-Oct-07
SS-SP-03 4-Oct-07

NB First 2 bolts are set in the concrete entrance cover. The bolts are therefore not covered by the BCA scheme. However, the CSCC has proof tested them with a load of 10KN instead of the usual 6KN.

ENTRANCE RIGGING (NB The bolts in the concrete are for rigger protection, not the main hang)
Topos courteousy of Chris Binding.

Rigging 1

ENTRANCE PITCH

Rigging 2

SECOND PITCH

Rigging 3

Swildon's Hole
Anchor Number Next Test Due
SH-TW-01 4-Dec-09
SH-TW-02 24-Jan-09
SH-TW-04 15-Nov-08
SH-CA-01 18-Mar-10
SH-CA-02 18-Mar-10
SH-CA-03 18-Mar-10
SH-CA-04 18-Mar-10
SH-CA-05 18-Mar-10
SH-CA-06 18-Mar-10
SH-CA-07 18-Mar-10
SH-CA-08 18-Mar-10
SH-CA-09 18-Mar-10
SH-CA-10 18-Mar-10
SH-CA-11 18-Mar-10
SH-CA-12 18-Mar-10
SH-CA-13 18-Mar-10
SH-CA-14 18-Mar-10
SH-SP-01 21-Mar-12
SH-SP-02 21-Mar-12
SH-SP-03 21-Mar-12
SH-SP-04 21-Mar-12
SH-BP-01 28-Sep-09

Waterwheel Swallet
Anchor Number Next Test Due
WW-FP-01 30-May-08
WW-FP-02 30-May-08
WW-FP-03 30-May-08
WW-FP-04 30-May-08

Thrupe Lane Swallet
Anchor Number Next Test Due
TL-EP-01 12-May-12
TL-EP-02 12-May-12
TL-EP-03 12-May-12
TL-EP-04 12-May-12
TL-EP-05 12-May-12
TL-HA-01 12-May-12
TL-HA-02 12-May-12
TL-HA-03 12-May-12
TL-HA-04 12-May-12
TL-HA-05 12-May-12
TL-HA-06 12-May-12
TL-HA-07 12-May-12
TL-PP-01 12-May-09
TL-PP-02 12-May-09
TL-LP-01 12-May-09
TL-LP-02 12-May-09
TL-LP-03 12-May-09
TL-LP-04 12-May-09
TL-LA-01 12-May-09
TL-LA-02 12-May-09
TL-LA-03 12-May-09
TL-MS-01 12-May-09
TL-MS-02 12-May-09
TL-SP-01 12-May-09
TL-SP-02 12-May-09
TL-SP-03 12-May-09

PERSEVERENCE PITCH, SLITHER POT, STREAMWAY / LEDGE PITCH
Topo courteousy of Chris Binding