This shows you the differences between the selected revision and the current version of the page.
| equipment:start 01/02/2010 17:05 | equipment:start 07/09/2010 19:43 current | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| ====== Equipment ====== | ====== Equipment ====== | ||
| + | ===== CSCC ANCHOR PLACEMENT PROGRAMME ===== | ||
| + | See [[cscc_anchor_placement_programme|CSCC Anchor Placement Programme]] | ||
| + | |||
| ===== ECO ANCHORS MAINTAINED BY THE CSCC ===== | ===== ECO ANCHORS MAINTAINED BY THE CSCC ===== | ||
| All anchors should be checked before use. [[http://www.cncc.org.uk/tg_safety.html|Checks To Do]] | All anchors should be checked before use. [[http://www.cncc.org.uk/tg_safety.html|Checks To Do]] | ||
| Line 11: | Line 14: | ||
| The BCA Anchor Placement Scheme was developed by the CNCC. [[http://www.cncc.org.uk/cncc_technical_group.html|Information about the Scheme.]] | The BCA Anchor Placement Scheme was developed by the CNCC. [[http://www.cncc.org.uk/cncc_technical_group.html|Information about the Scheme.]] | ||
| + | ---- | ||
| + | |||
| + | ===== Anchor Scheme Forms ===== | ||
| + | |||
| + | If you come across a defective anchor please use the {{:equipment:cscc_2010.04.21_defective_anchor_form.pdf|Defective Anchor Form}} | ||
| + | |||
| + | If you have a location that you believe needs anchors please use the {{:equipment:cscc_2010.04.21_new_anchor_request_form.pdf|New Anchor Request Form}} | ||
| ---- | ---- | ||
| Line 121: | Line 131: | ||
| |RR-FP-06|Removed| | |RR-FP-06|Removed| | ||
| |RR-FP-07| | | |RR-FP-07| | | ||
| - | |RR-FP-08| | | + | |RR-FP-08|Reported defective, under investigation| |
| - | |RR-SP-01| | | + | |RR-SP-01|Reported defective, under investigation| |
| |RR-SP-02| | | |RR-SP-02| | | ||
| |RR-SP-03| | | |RR-SP-03| | | ||