Differences
This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
|
equipment:start [06 Jan 2025 18:40] andrew Corrected broken links to reoved pages |
equipment:start [19 Jun 2026 07:41] (current) andrew Added Reservoir |
||
|---|---|---|---|
| Line 13: | Line 13: | ||
| To be part of the scheme the placement of anchors must be approved by the CSCC. CSCC makes available [[CSCC Anchor Placement Programme|past proposals]] that have been declined. Inclusion in this list does not exclude them as being proposed again in the future. | To be part of the scheme the placement of anchors must be approved by the CSCC. CSCC makes available [[CSCC Anchor Placement Programme|past proposals]] that have been declined. Inclusion in this list does not exclude them as being proposed again in the future. | ||
| - | The placement of anchors is on going. For more information see the list of approved placements by cave below.[[equipment: | + | The placement of anchors is on going. For more information see the list of approved placements by cave [[equipment: |
| ---- | ---- | ||
| Line 30: | Line 30: | ||
| ===== List of placement by cave ===== | ===== List of placement by cave ===== | ||
| - | ==== Blacknor Hole ==== | ||
| - | |**Anchor Number**| | ||
| - | |BH-EP-01|Cut Off| | ||
| - | |BH-EP-02|Cut Off| | ||
| - | |BH-EP-03| | | ||
| - | |BH-EP-04| | | ||
| - | |BH-EP-05| | | ||
| - | |BH-EP-06| | | ||
| - | EP = Entrance Pitch | + | [[ Blacknor Hole | Blacknor Hole ]] |
| + | [[Charterhouse Cave]] | ||
| - | ==== Charterhouse | + | [[GB Cave]] |
| - | |**Anchor Number**| | + | |
| - | |CH-DP-01| | + | |
| - | |CH-DP-02| | + | |
| - | |CH-DP-03| | + | |
| - | DP = Dragon Pitch | + | [[Gough' |
| - | ==== GB Cave ==== | + | [[Hunter' |
| - | |**Anchor Number**| | + | |
| - | |GB-LD-01| | + | |
| - | |GB-LD-02| | + | |
| - | |GB-LD-03| | + | |
| - | |GB-LD-04| | + | |
| - | LD = Ladder Dig | + | [[Longwood Swallet]] |
| - | ==== Gough' | + | [[Manor Farm Swallet]] |
| - | + | ||
| - | |**Anchor Number**| | + | |
| - | |GC-LH-01| | + | |
| - | |GC-LH-02| | + | |
| - | |GC-LH-03| | + | |
| - | |GC-LH-04| | + | |
| - | |GC-LH-05| | + | |
| - | |GC-LH-06| | + | |
| - | |GC-LH-07| | + | |
| - | |GC-OX-01| | + | |
| - | |GC-OX-02| | + | |
| - | |GC-OX-03| | + | |
| - | LH = Lloyd Hall | + | [[Reservoir Hole]] |
| - | OX = Oxbow | + | |
| - | ==== Hunter' | + | [[Rhino Rift]] |
| - | |**Anchor Number**| | + | [[Rod' |
| - | |HH-EP-01| | + | |
| - | |HH-EP-02| | + | |
| - | |HH-MH-01| | + | |
| - | |HH-MH-02| | + | |
| - | |HH-MH-03| | + | |
| - | |HH-MH-04| | + | |
| - | |HH-MH-05| | + | |
| - | |HH-MH-06| | + | |
| - | |HH-MH-07| | + | |
| - | |HH-FR-01| | + | |
| - | |HH-FR-02| | + | |
| - | |HH-FR-03| | + | |
| - | |HH-FR-04| | + | |
| - | |HH-FR-05| | + | |
| - | |HH-FR-06| | + | |
| - | |HH-FR-07| | + | |
| - | |HH-FR-08| | + | |
| - | |HH-FR-09| | + | |
| - | |HH-SP-01| | + | |
| - | |HH-SP-02| | + | |
| - | |HH-SP-03| | + | |
| - | EP = Entrance Pitch MH = Main Hang FR = Far right SP = Sago Pot | + | [[Spider Hole]] |
| - | __**Entrance Pitch, Direct Traverse (Right-Hand Route), Sago Pot**__\\ | + | [[Star Shaft]] |
| - | Topo courteousy of Chris Binding\\ | + | |
| - | {{: | + | |
| + | [[Swildon' | ||
| - | ==== Longwood | + | [[Waterwheel |
| - | + | ||
| - | |**Anchor Number**| | + | |
| - | |LO-SP-01| | + | |
| - | SP = Swing Pitch | + | [[White Pit]] |
| - | ==== Manor Farm Swallet ==== | + | [[Thrupe Lane Swallet]] |
| - | + | ||
| - | |**Anchor Number**| | + | |
| - | |MF-SR-01| | + | |
| - | |MF-SR-02| | + | |
| - | |MF-SR-03| | + | |
| - | |MF-SR-04| | + | |
| - | + | ||
| - | SR = September Rift | + | |
| - | + | ||
| - | ==== Rhino Rift ==== | + | |
| - | + | ||
| - | |**Anchor Number**| | + | |
| - | |RR-FP-01| | + | |
| - | |RR-FP-02| | + | |
| - | |RR-FP-03| | + | |
| - | |RR-FP-04| | + | |
| - | |RR-FP-05|Removed| | + | |
| - | |RR-FP-06|Removed| | + | |
| - | |RR-FP-07| | + | |
| - | |RR-FP-08|Reported defective, under investigation| | + | |
| - | |RR-SP-01|Reported defective, under investigation| | + | |
| - | |RR-SP-02| | + | |
| - | |RR-SP-03| | + | |
| - | |RR-SP-04| | + | |
| - | |RR-SP-05| | + | |
| - | |RR-SP-06| | + | |
| - | |RR-TP-01| | + | |
| - | |RR-TP-02| | + | |
| - | |RR-TP-03| | + | |
| - | + | ||
| - | FP = First Pitch SP = Second Pitch TP = Third Pitch | + | |
| - | + | ||
| - | {{: | + | |
| - | + | ||
| - | ==== Rod's Pot ==== | + | |
| - | + | ||
| - | |**Anchor Number**| | + | |
| - | |RP-PP-01| | + | |
| - | |RP-PP-02| | + | |
| - | |RP-PP-03| | + | |
| - | |RP-PP-04| | + | |
| - | + | ||
| - | + | ||
| - | ==== Star Shaft ==== | + | |
| - | + | ||
| - | |**Anchor Number**| | + | |
| - | |SS-EP-02| | + | |
| - | |SS-EP-03| | + | |
| - | |SS-SP-01| | + | |
| - | |SS-SP-02| | + | |
| - | |SS-SP-03| | + | |
| - | + | ||
| - | EP = Entrance Pitch SP = Second Pitch | + | |
| - | + | ||
| - | NB First 2 bolts are set in the concrete entrance cover. The bolts are therefore not covered by the BCA scheme. However, on the advice of the BCA Equipment and Techniques Committee, the CSCC has proof tested them with a load of 10KN instead of the usual 6KN. | + | |
| - | + | ||
| - | __**Entrance Rigging**__ (NB The bolts in the concrete are for rigger protection, not the main hang)\\ | + | |
| - | Topos courteousy of Chris Binding.\\ | + | |
| - | {{: | + | |
| - | + | ||
| - | __**Entrance Pitch**__\\ | + | |
| - | {{: | + | |
| - | + | ||
| - | __**Second Pitch**__\\ | + | |
| - | {{: | + | |
| - | + | ||
| - | ==== Swildon' | + | |
| - | + | ||
| - | |**Anchor Number**| | + | |
| - | |SH-TW-01| | + | |
| - | |SH-TW-02| | + | |
| - | |SH-TW-03| | + | |
| - | |SH-CA-01| | + | |
| - | |SH-CA-02| | + | |
| - | |SH-CA-03| | + | |
| - | |SH-CA-04| | + | |
| - | |SH-CA-05| | + | |
| - | |SH-CA-06| | + | |
| - | |SH-CA-07| | + | |
| - | |SH-CA-08| | + | |
| - | |SH-CA-09| | + | |
| - | |SH-CA-10| | + | |
| - | |SH-CA-11| | + | |
| - | |SH-CA-12| | + | |
| - | |SH-CA-13| | + | |
| - | |SH-CA-14| | + | |
| - | |SH-SP-01| | + | |
| - | |SH-SP-02| | + | |
| - | |SH-SP-03| | + | |
| - | |SH-SP-04| | + | |
| - | |SH-BP-01| | + | |
| - | + | ||
| - | TW = Twenty CA = Cowsh Avens SP = Swine Puke BP = Blue Pencil | + | |
| - | + | ||
| - | + | ||
| - | + | ||
| - | ==== Waterwheel Swallet ==== | + | |
| - | + | ||
| - | |**Anchor Number**| | + | |
| - | |WW-FP-01| | + | |
| - | |WW-FP-02| | + | |
| - | |WW-FP-03| | + | |
| - | |WW-FP-04| | + | |
| - | + | ||
| - | FP = First Pitch | + | |
| - | + | ||
| - | ==== Thrupe Lane Swallet ==== | + | |
| - | + | ||
| - | |**Anchor Number**| | + | |
| - | |TL-EP-01| | + | |
| - | |TL-EP-02| | + | |
| - | |TL-EP-03| | + | |
| - | |TL-EP-04| | + | |
| - | |TL-EP-05| | + | |
| - | |TL-HA-01| | + | |
| - | |TL-HA-02| | + | |
| - | |TL-HA-03| | + | |
| - | |TL-HA-04| | + | |
| - | |TL-HA-05| | + | |
| - | |TL-HA-06| | + | |
| - | |TL-HA-07| | + | |
| - | |TL-PP-01| | + | |
| - | |TL-PP-02| | + | |
| - | |TL-LP-01| | + | |
| - | |TL-LP-02| | + | |
| - | |TL-LP-03| | + | |
| - | |TL-LP-04| | + | |
| - | |TL-LA-01| | + | |
| - | |TL-LA-02| | + | |
| - | |TL-LA-03| | + | |
| - | |TL-MS-01| | + | |
| - | |TL-MS-02| | + | |
| - | |TL-SP-01| | + | |
| - | |TL-SP-02| | + | |
| - | |TL-SP-03| | + | |
| - | + | ||
| - | __**Perseverence Pitch, Slither Pot, Streamway / Ledge Pitch**__\\ | + | |
| - | Topo courteousy of Chris Binding\\ | + | |
| - | {{: | + | |