Differences
This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
start [01 Aug 2020 12:56] cookie [Coronavirus] Eastwater reopens |
start [20 Sep 2020 11:08] cookie [Home] EGM/AGM info |
||
---|---|---|---|
Line 1: | Line 1: | ||
< | < | ||
+ | <col xs=" | ||
+ | <panel type=" | ||
+ | An updated [[: | ||
+ | |||
+ | This has been updated to include an election statement from Ed Waters, a BCA council report and CSCC proposals to BCA AGM, deferred from the last meeting. | ||
+ | |||
+ | The meeting will be addressing the constitution changes which were deferred at a number of previous AGM/ | ||
+ | |||
+ | </ | ||
+ | </ | ||
+ | |||
<col xs=" | <col xs=" | ||
<panel type=" | <panel type=" | ||
Line 9: | Line 20: | ||
* Fairy Cave Quarry Caves reopen on 13th June. | * Fairy Cave Quarry Caves reopen on 13th June. | ||
* Eastwater, North Hill reopen 1st Aug. | * Eastwater, North Hill reopen 1st Aug. | ||
+ | * Tyning' | ||
Please follow the link to read the updated access conditions. | Please follow the link to read the updated access conditions. |